Recalbox Forum

    • Register
    • Login
    • Search
    • Recent
    • Tags
    • recalbox.com
    • Gitlab repository
    • Documentation
    • Discord

    Change order of gamepads?

    GamePad/GPIO/USB encoder
    order gamepads
    3
    5
    3795
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • noxx
      noxx last edited by noxx

      hello

      RCB recognize my controller as
      0 LOGITECH
      1 XBOX 360

      is it possible to change the ordner to
      0 XBOX 360
      1 LOGITECH

      ?

      1 Reply Last reply Reply Quote 0
      • acris
        acris last edited by

        Hello
        emulationstation Menu > options gamepad > player 1 or player 2

        1 Reply Last reply Reply Quote 0
        • noxx
          noxx last edited by noxx

          ok, i try it, background is, in RCB is
          XBOX = Controller 1
          LOGITECH = Controller 2

          In N64 Emus, is
          XBOX = Player 2
          LOGITECH = Player 1

          1 Reply Last reply Reply Quote 0
          • Substring
            Substring last edited by

            N64 is the exception, can't force player order (yet ?)

            Former dev - Please reply with @substring so that i am notified when you answer me
            Ex dev - Merci de me répondre en utilisant @substring pour que je sois notifé

            1 Reply Last reply Reply Quote 0
            • noxx
              noxx last edited by noxx

              no,? what is the reason, that i add my XBOX Controller to Controller 1 and
              in N64-Emulator is it Controller 2?

              here under Controller Settings
              https://github.com/recalbox/recalbox-os/blob/master/wiki/images/settings.jpg
              is XBOX = 1
              LOGITECH = 2

              Edit
              Found this
              https://m.reddit.com/r/RetroPie/comments/4b5idq/change_controller_order/

              1 Reply Last reply Reply Quote 0
              • First post
                Last post

              Want to support us ?

              305
              Online

              101.3k
              Users

              28.1k
              Topics

              187.1k
              Posts

              Copyright © 2021 recalbox.com